St Peter’s Leisure Centre Sauna And Health Suite Refurbishment
Refurbishment of St Peter’s Leisure Centre health suite, modernising the sauna, steam room, and shower areas with durable finishes and enhanced facilities in just 4 weeks.
Comprehensive refurbishment of Burnley’s public leisure centre, modernising sauna, steam room, and health suite facilities for enhanced durability, comfort, and user experience.
Sector: Leisure / Public Sector
Location: Burnley, Lancashire
Value: £96,000
Client: Burnley Borough Council
Programme: 4 Weeks
Project Overview
Burnley Borough Council commissioned Deakin’s Group to refurbish the health suite facilities at St Peter’s Leisure Centre, including the sauna, steam room, and associated shower areas.
The project aimed to modernise ageing facilities, improve durability in high-moisture environments, and enhance the overall user experience, all while maintaining a safe and operational leisure centre for the public.
Scope Of Work
The refurbishment encompassed a complete strip-out and renewal of the existing health suite facilities, delivering a modern, high-quality environment for public use:
Core Works:
Removal of the existing sauna, steam room, and shower finishes
Installation of new wall build-ups, including metal framing, marine ply, cement boards, and waterproof tanking systems
Renewal of tiled finishes, grout, and moisture-resistant decorations
Full refurbishment of shower areas, including new enclosures, fittings, and drainage systems
Specialist installation of new sauna and steam room facilities, including seating, lighting, ventilation, and glazed access systems
Additional Improvement Works:
Internal decoration upgrades to the surrounding areas
Access control enhancements for improved safety and user management
Fire suppression system upgrades, coordinated with specialist contractors
Project Delivery
Completed within a constrained four-week programme, the project required careful sequencing of multiple trades and specialist subcontractors within an operational leisure centre.
Key delivery considerations included:
Maintaining safe access and segregation within live areas
Protection of existing finishes and adjacent facilities
Coordinated scheduling of enabling works and specialist installations
Close collaboration with nominated contractors and supplier-led installations
Quality And Coordination
High-quality finishes and long-term durability were a central focus, particularly in wet-area environments exposed to intensive public use:
Integrated waterproofing systems to ensure long-lasting performance
Close coordination with specialist supplier Anapos Ltd to align preparatory works with sauna and steam room installations
Management of fire suppression system modifications to meet compliance requirements
Consistent quality control across all health suites and wet-area works
Handover
The project concluded with a full site clean and reinstatement of all areas. Comprehensive health and safety documentation and O&M manuals were provided. All systems, including sauna and steam room installations, were fully tested, commissioned, and handed over in collaboration with the client and specialist contractors.
Conclusion
The St Peter’s Leisure Centre health suite refurbishment was successfully delivered on time and within budget. The project transformed ageing facilities into a modern, durable, and high-quality environment suitable for intensive public use.
The extended improvement works further enhanced the leisure centre, providing upgraded safety, accessibility, and long-term performance for the client and visitors alike.
Power in Numbers
4
Week Programme
1
Point Of Contact
5
Star Service